Option 1


Everything required for the build to arrive at once. *Whole payment must be made upfront. **Please allow unto 8 weeks for delivery.

Option 2


Receive everything you need for the outside of the house in one lot and everything for the inside in another lot. *Please allow unto 8 weeks for delivery.

Option 3


Receive your kiteset in instalments. Our instalment template is pictured below:


    First delivery

  • floor kit - (if included)
  • Second delivery
  • Frames
  • Trusses
  • Loose timber: - perils
  • top plate packer
  • ceiling batterns
  • beams(if included) - 90x45 as required - 70x45 as required
  • Building paper
  • Window tapes and corners
  • Soffit linings and joiners

    Delivery by supplier

  • Fascia, gutter and downpipes (if steel)
  • Roof
  • Flashings
  • Roof underlay
  • Mesh underlay (if required)
  • Screws and barges
  • Soffit flashings (steel)
  • Third delivery

  • Cladding of choice - Weatherboard
  • Brick (delivered by supplier)
  • Cavity battern (if needed)
  • Flashings (if needed)
  • Scriber batters (if needed)
  • Soffit flashings (timber)
  • Delivery by supplier

  • Windows and doors
  • Fourth delivery

  • Batts (wall and ceiling)
  • Gibb board
  • Skirting
  • Gibb cove
  • Architraves
  • Internal doors
  • Door handles
  • Fifth delivery

  • Kitchen (Flatpack)
  • Appliances
  • Slide Shower
  • Bath
  • Vanities
  • Tap ware
  • Toilets
  • HWC
  • Laundry tub